Redwood fence installation
A fence repair in San Fransisco!
We had to:
- Remove 7 existing 4"x4" redwood posts that were rotted.
- Excavate 4 new 1' wide x 2' deep holes for the new posts we set.
- Placed leveled and aligned the 4 new 4"x4" pressure-treated posts.
- Poured concrete into the pre-excavated holes.
- Framed the fence with 2"x4" pressure-treated lumber.
- Installed all new 1"x8" redwood boards.
- Fabricated a new gate.
- Secured the 2"x4" pressure-treated fence post at the edge with cement screws.
- Finished with a coat of primer and paint selected by our client.