Do I need an architect?
4 years ago
Featured Answer
Sort by:Oldest
Comments (31)
- 4 years ago
Related Discussions
do i need to use a dehumidifyer to dry out newlog house
Comments (3)Are the logs that green? Most modern log cabins are composed of well seasoned or kiln dried or radio frequency dried material to maintain their size after construction. Otherwise it would be back to the frontier days and you'd be re-chinking the gaps that opened up between the logs every fall. Rent a moisture meter and check with the log home manufacturer....your logs' interior moisture should be below 17%. If not, a standard residential dehumidifier won't touch them for about a year. I've built a kiln drying shed and dried big timbers with fan forced heat and it took six weeks for the wood to reach 17% moisture content....at over 180 deg. F with continuous air flow and gaps around each timber. Stacked timbers become a mass unto themselves and without air flow on all sides can take many years to dry. If it is humid in the house, the more likely cause is drywall finishing, paint and tile work, all trades that introduce copious amounts of water to the interior environment. That would be mitigated by a dehumidifier....See MoreWhere do i go from here? Needs a pop of colour but what colour?
Comments (13)I think your colors are restful so I would work with those and not pop a color. Maybe some interesting artwork that had some color in it, but I think you should go for a more elegant calm look. By the way, I like the chandelier you have with the fireplace. I think I would paint the lower part of your wall the same blue as is in the top part. Then I would add some black accents in glass and lamps. Curtains that have a sheen or gold thread would be nice....See Moreneed help to finish patio and cover this bank. i do not want garden
Comments (2)I would use some tall grasses. The roots would keep that soil stitched together well. They have little maintenance and look fantastic in the light and breeze....See Morecontractors and architect
Comments (0)Hi all, I currently have an architects plan for a new rear extension. The architect has put it to tender with two builders. The first figure came in at €80,000. This outlined every single cost in a detailed report. Unfortunately it’s way above the budget i specified to the architect (€60,000). The second builder has come back with €60,000. I asked the architect for a price breakdown as before but his response was: “The contractor has agreed to do the revised works as per my tender drawings. He maintains that this is still very tight from his perspective. The figure therefore is a lump sum to cover all works.” My concern is that a) The job will go over budget b) the job won’t be completed to good quality. My question is how can I be guaranteed any of the above? I asked for a reference but I feel like the architect might just want this project closed and finished as we started discussions about this last year. Any advice or opinion is much appreciated....See More- 4 years ago
- 4 years agolast modified: 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years agolast modified: 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years agolast modified: 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years agolast modified: 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago
- 4 years ago

Sponsored
Reload the page to not see this specific ad anymore





worthy