Mjolnir Construction
Mjolnir Construction
Average rating: 5 out of 5 stars12 ReviewsView Profile

250 Sqft. of TimberTech Composite Decking

This was a large renovation project which featured both small and large changes in the design. We started by replacing the 6x6 supporting posts and adding 4x4 cross bracing along with all required bases and caps from Simpson Strong-Tie. We removed 250 Sqft. of vinyl decking which had been installed incorrectly and had been causing serious water and drainage issues. We then installed TimberTech Edge Prime composite decking in the colour Dark Teak, making sure to install additional joists to satisfy the 12" OC requirement. We also had removed and reinstalled the existing spindle and glass aluminum railing, while slightly changing the design of the upper privacy screen. The customers were extremely happy with the final product and can now enjoy their deck knowing it has been done right. I also filmed a small IGTV series documenting the work that was done, you can watch it here - https://www.instagram.com/mjolnirconstruction/channel
Ireland
Tailor my experience with cookies

Houzz uses cookies and similar technologies to personalise my experience, serve me relevant content, and improve Houzz products and services. By clicking ‘Accept’ I agree to this, as further described in the Houzz Cookie Policy. I can reject non-essential cookies by clicking ‘Manage Preferences’.