skip to main content
Photos
Photos
Kitchen & DiningKitchenDining RoomKitchen/Diner
BathroomBathroomCloakroomEnsuite
LivingLiving RoomGames RoomConservatory
OutdoorGardenBalconyPatio
BedroomBedroomKids' BedroomNursery
Small SpacesSmall KitchenSmall BathroomSmall Garden
More RoomsHallwayStaircaseUtility RoomHome OfficeEntrance HallPantryHouse ExteriorWalk-in WardrobeView All
Stories
Stories From Houzz
Most PopularHouzz ToursKitchensBathroomsMore RoomsGardensRenovatingDecoratingStorage & OrganisationSmall Space LivingTips for ProsView All
Houzz Discussions
Design DilemmaBefore & AfterPollsKitchensBathroomsLiving RoomsGardensRenovatingDIYHome DecoratingSmaller HomesPaint
Houzz Research
Advice
HOUZZ DISCUSSIONS
Design DilemmaBefore & AfterPollsKitchensBathroomsLiving Rooms
GardensRenovatingDIYHome DecoratingSmaller HomesPaint
Sign In
Join as a Pro
History of Houzz
Houzz Logo Print

Floors

Diane McGaw
Diane McGaw
Photo
Photo

Southampton hulk floors

Q

Comment
SJ McCarthy

So long as the moisture levels have been tested by your flooring professional (not the 'guy' the GC makes install the floor) and the barrier has been proven to be intact, you are welcome to glue down the hardwood. It is still HIGHLY recommended that you use the BEST adhesive on the market...just in case. The slab still needs to be LEVELED. The flatness of a freshly poured concrete is rarely good enough to put down a rigid floor (most pours are ready for carpet and that's about it). The subfloor preparation still needs to be dealt with. And again, this needs to be done by the wood flooring PROFESSIONAL that the GC HIRES to deal with this part of the project. Please do NOT let the GC give this job to a 'guy who swings a hammer'. This type of stuff needs to be dealt with by the specialists. Just like plumbing and electrical are dealt with by professionals, so too a flooring preparation and wood floor install need to be dealt with by specialists.

Q

Reply to: So long as the moisture levels have been tested by your flooring professional (not the 'guy' the GC makes install the floor) and the barrier has been proven to be intact, you are welcome to glue down the hardwood. It is still HIGHLY recommended that you use the BEST adhesive on the market...just in case. The slab still needs to be LEVELED. The flatness of a freshly poured concrete is rarely good enough to put down a rigid floor (most pours are ready for carpet and that's about it). The subfloor preparation still needs to be dealt with. And again, this needs to be done by the wood flooring PROFESSIONAL that the GC HIRES to deal with this part of the project. Please do NOT let the GC give this job to a 'guy who swings a hammer'. This type of stuff needs to be dealt with by the specialists. Just like plumbing and electrical are dealt with by professionals, so too a flooring preparation and wood floor install need to be dealt with by specialists.

Q

Photo
Photo
Product

Contemporary Laminate Flooring

Q

Photo
Photo

St Moritz European elegance

Q

Product

Turfway Engineered Hardwood, Ecru

Q

Product

Vanier Engineered Hardwood | White Oak | White | 7.5in.

Q

Product

Maywood Engineered Hardwood, Bone

Q

Product

French Oak Prefinished Engineered Wood Floor, Sierra, Sample

Q

Photo

Color

Q

Photo
Photo
Photo
Photo
Photo
Related Photo Topics
    Contemporary Kids' Bedroom PicturesScandi Living Room DesignsTraditional Bedroom IdeasClassic Kitchen Decorating IdeasContemporary Kids' Bedrooms
  • Ireland
    © 2026 Houzz Inc.
    • COMPANY

    • About Houzz
    • In the News
    • Press Info
    • Careers
    • Contact Us
    • Terms & Privacy
    • Copyright & Trademark
    • EXPLORE HOUZZ

    • Buttons & Badges
    • Mobile Apps
    • For Brands
    • For Professionals
    • Review Professionals
    • Suggested Professionals
    • FAQs
    • CONNECT WITH US

    • TwitterXCircleX
    • Facebook
    • RSS