We have nearly finished building a new house which has wet system underfloor heating all through the downstairs.
The screed has been down for 8/9 months and is sufficiently dry.
We have the dpm underlay.
However, the underfloor heating isn't connected and working yet.
Is it a bad idea to start laying the laminate flooring before the underfloor heating is working and the screed is at its working temperatures. (we've already started laying it and I'm now worrying!)